I wonder if anybody has advice about my particular flooring type:
Flooring is solid Teak, pre-finished with lacquer, 18mm thick, 400mm long, 90mm wide. T&G.
Subfloor is 22mm T&G chipboard on first floor joists. Level and firm. Has moisture resistant coating on top. Thermal and acoustic insulation placed in joist space (new build). The house is not heated yet but is sealed.
Nailing puts me off because of fear of damaging the finish and splitting the tongues, as well as the cost of the gun and laying time.
Ta
Installing wood block flooring
Moderator: Moderators
- Tryanything
- Senior Member
- Posts: 1860
- Joined: Sat Aug 18, 2007 9:47 pm
- Has thanked: 0
- Been thanked: 4 times
If its new build l would not even consider buying the wood for 3 months
and the heating system been up and running for a good lengh of time
Reason being thousands of litres of water are used when building a house
and it takes a long time to dry out
If the flooring is brought in to soon or layed to soon it will draw in this
moisture and expand, then shrink when everything dries out
and the heating system been up and running for a good lengh of time
Reason being thousands of litres of water are used when building a house
and it takes a long time to dry out
If the flooring is brought in to soon or layed to soon it will draw in this
moisture and expand, then shrink when everything dries out
There would be less trouble in the world
if l had not had six daughters
if l had not had six daughters
-
- Senior Member
- Posts: 117
- Joined: Mon Feb 11, 2008 11:45 pm
- Location: ENGLAND
- Has thanked: 11 times
- Been thanked: 0
I said new-build but, as a self-builder, it has taken since 2006 to build it, so things have had a long time to dry out (2 summers), for instance the block walls on the floor where I will install the flooring have been there for some 18 months and I did not plaster the walls, I used plasterboard.
I could use fan heaters to raise the temperature in each room as I install the flooring.
By the way, I forgot to say that I will install the flooring in a brickwork format, not in criss-cross pattern as parquet.
I could use fan heaters to raise the temperature in each room as I install the flooring.
By the way, I forgot to say that I will install the flooring in a brickwork format, not in criss-cross pattern as parquet.
- joiner_uk
- Senior Member
- Posts: 332
- Joined: Tue Apr 08, 2008 9:04 pm
- Location: Sheffield
- Has thanked: 0
- Been thanked: 6 times
[quote="fredmila"]I could use fan heaters to raise the temperature in each room as I install the flooring.quote]
Very bad idea!
Be sure to leave the flooring in the room a good week or so prior to fitting
Some info on flooring here
http://www.woodfx.co.uk/timberfloors.html
Very bad idea!
Be sure to leave the flooring in the room a good week or so prior to fitting
Some info on flooring here
http://www.woodfx.co.uk/timberfloors.html