Tiling SOS!
Moderator: Moderators
-
- Newly registered Member
- Posts: 5
- Joined: Thu Feb 26, 2009 10:04 pm
- Has thanked: 0
- Been thanked: 0
Tiling SOS!
I have recently tiled my bathroom floor with fairly large tiles & was very pleased with myself until I noticed the grout cracking & small movement of a few tiles. I had tiled straight on top of laminate flooring without securing the flooring to the floorboards (I know...)
I'm sure there's eye-rolling & finger wagging at my stupidity (I'm new to this) but my question is, can / should I re-tile on top of the existing tiles (obviously changeing the layout so tiles overlap)? Or should I rip the whole thing up & start again?
The movement is tiny / almost imperceptible so I hoped that I could tile on top of the existing tiles, but I don't want to botch the job for a second time! Your expert advice welcomed please (go easy on me, I'm new to DIY!)
I'm sure there's eye-rolling & finger wagging at my stupidity (I'm new to this) but my question is, can / should I re-tile on top of the existing tiles (obviously changeing the layout so tiles overlap)? Or should I rip the whole thing up & start again?
The movement is tiny / almost imperceptible so I hoped that I could tile on top of the existing tiles, but I don't want to botch the job for a second time! Your expert advice welcomed please (go easy on me, I'm new to DIY!)
- manchestertiling
- Senior Member
- Posts: 107
- Joined: Mon Feb 16, 2009 5:51 pm
- Location: Manchester UK
- Has thanked: 0
- Been thanked: 0
IMO Scobie lift all the tiles, rip out the laminate & underlay. This will probably reveal the floorboards. They should be checked first & securely fixed.
Overboard with 18mm ply screwed at 300mm centres, this may create quite a step at the entrance to your bathroom, if so you could take out the floorboards & board with 25mm ply straight to the joists, again fixing at 300mm centres.
Use a quality powdered flexible adhesive when laying & finish again with a quality flexible grout.
Overboard with 18mm ply screwed at 300mm centres, this may create quite a step at the entrance to your bathroom, if so you could take out the floorboards & board with 25mm ply straight to the joists, again fixing at 300mm centres.
Use a quality powdered flexible adhesive when laying & finish again with a quality flexible grout.
Paul
[url=http://www.manchestertiling.co.uk]manchester tiling[/url]
[url=http://www.manchestertiling.co.uk]manchester tiling[/url]
- manchestertiling
- Senior Member
- Posts: 107
- Joined: Mon Feb 16, 2009 5:51 pm
- Location: Manchester UK
- Has thanked: 0
- Been thanked: 0
- manchestertiling
- Senior Member
- Posts: 107
- Joined: Mon Feb 16, 2009 5:51 pm
- Location: Manchester UK
- Has thanked: 0
- Been thanked: 0
- manchestertiling
- Senior Member
- Posts: 107
- Joined: Mon Feb 16, 2009 5:51 pm
- Location: Manchester UK
- Has thanked: 0
- Been thanked: 0
I remember when I did mine couple of years back, 22sqm floor, all the floorboards came up & filled 6 heavy duty bin bags with the crap that was in between the joists, must have been 80yrs worth of rubbish just thrown into the floor space when work had been carried out on it.
Not looking forward to starting the bedrooms
Not looking forward to starting the bedrooms
Paul
[url=http://www.manchestertiling.co.uk]manchester tiling[/url]
[url=http://www.manchestertiling.co.uk]manchester tiling[/url]
- manchestertiling
- Senior Member
- Posts: 107
- Joined: Mon Feb 16, 2009 5:51 pm
- Location: Manchester UK
- Has thanked: 0
- Been thanked: 0