Hi
Which job should we complete first please? We are ripping out the old bath etc. and taking all the old wall tiles off and starting again. But should we put the new wall tiles up first, then install the bathroom or vice versa? Many thanks.
Installing new bathroom suite and wall tiles.
Moderator: Moderators
-
- Senior Member
- Posts: 117
- Joined: Mon Mar 29, 2010 5:13 pm
- Location: Yorkshire/UK
- Has thanked: 0
- Been thanked: 1 time
-
- Senior Member
- Posts: 425
- Joined: Wed Jul 16, 2008 8:23 pm
- Has thanked: 2 times
- Been thanked: 26 times
Re: Installing new bathroom suite and wall tiles.
rearrange pipework to suit, fit bathroom , then tile.
What would you rather bee or a wasp!
_________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk/
_________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk/
-
- Senior Member
- Posts: 6620
- Joined: Sun Jan 24, 2010 1:48 pm
- Location: Essex
- Has thanked: 39 times
- Been thanked: 621 times
Re: Installing new bathroom suite and wall tiles.
Take as many tiles off before taking out the bath, toilet and then you have use of it. Depending how big bathroom is, of course, or whether you also have an ensuite (or two).
Normally the bath will go in first, shower tray in first and then tiling complete and then fit basin and toilet.
Normally the bath will go in first, shower tray in first and then tiling complete and then fit basin and toilet.