Double side extension 2012:- 53sq metres of floor area

This is where you can post pictures of work that you have done. Tradesmen and DIY pictures are all welcome. Please only post pictures of work that you have done personally. Thanks

Moderator: Moderators

Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

Hi all

Got all upstairs ceilings boarded in the last day or so, got a week off now to really get this place sorted for the plasterer, lots of bits to do to get it sorted so could be a few long days coming :shock:

Pictures to follow in the next few days.....

Thank you
GrogSym
Newly registered Member
Posts: 86
Joined: Tue Jan 31, 2012 11:17 am
Has thanked: 2 times
Been thanked: 8 times

Re: Double side extension 2012:- 53sq metres of floor

Post by GrogSym »

Good luck!
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

Evening All

A little bit of plasterboard on the walls and ceilings, much better than looking at the blockwork :wink:
2 bedrooms and the kitchen started, the big push now thou is to get all the kitchen finished ready for plastering within the next week or two, i also need the BI back this week to pass off the steelwork structures and insulation etc.. :salute:

Finalised the kitchen design this morning, a very painful day :cb

i will try and upload a picture of the kitchen design tomorrow...

Thanks for following the thread, really pleased to see we have now reached 10,000 views, hope people are picking up some tips along the way :huray:
Attachments
Kitchen with boarding started..
Kitchen with boarding started..
House Extension 2012 001 (Small).JPG (128.26 KiB) Viewed 3332 times
Kitchen
Kitchen
House Extension 2012 003 (Small).JPG (121.09 KiB) Viewed 3332 times
House Extension 2012 004 (Small).JPG
House Extension 2012 004 (Small).JPG (135.64 KiB) Viewed 3332 times
House Extension 2012 005 (Small).JPG
House Extension 2012 005 (Small).JPG (106.66 KiB) Viewed 3332 times
House Extension 2012 006 (Small).JPG
House Extension 2012 006 (Small).JPG (107.9 KiB) Viewed 3332 times
House Extension 2012 007 (Small).JPG
House Extension 2012 007 (Small).JPG (121.52 KiB) Viewed 3332 times
User avatar
root
Senior Member
Posts: 3030
Joined: Thu Apr 28, 2011 11:20 am
Location: Sussex
Has thanked: 168 times
Been thanked: 173 times

Re: Double side extension 2012:- 53sq metres of floor

Post by root »

loving the minimalist kitchen :lol:
- Dave
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

root wrote:loving the minimalist kitchen :lol:
Great pal isn't it, wish that's all there was on my list for the new kitchen, that would keep the cost down :lol:
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

:ttiuwop: :ttiuwop: :ttiuwop: :ttiuwop:

Yeeeeaaaaaahhhhh I have daylight back in my kitchen....

The bi folding door is 99% finished, photos to follow tomorrow, looks fantastic :huray:
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

Afternoon all

Had a busy week and managed to pull things along a bit, more plaster boarding done, Bi fold doors in, plyed the ceiling near the velux in the kitchen, re routed the water from the bathroom wastes across the steel work and out the gable end, kitchen ordered today and collected the fire door, so plenty done :thumbright:

here we go anyway...some more photo's
Attachments
House Extension 2012 009 (Small).JPG
House Extension 2012 009 (Small).JPG (122.81 KiB) Viewed 3244 times
House Extension 2012 008 (Small).JPG
House Extension 2012 008 (Small).JPG (127.38 KiB) Viewed 3244 times
House Extension 2012 007 (Small).JPG
House Extension 2012 007 (Small).JPG (165.2 KiB) Viewed 3244 times
and the door in the day light
and the door in the day light
House Extension 2012 006 (Small).JPG (164.52 KiB) Viewed 3244 times
House Extension 2012 005 (Small).JPG
House Extension 2012 005 (Small).JPG (128.83 KiB) Viewed 3244 times
The Door in
The Door in
House Extension 2012 004 (Small).JPG (157.35 KiB) Viewed 3244 times
House Extension 2012 003 (Small).JPG
House Extension 2012 003 (Small).JPG (166.88 KiB) Viewed 3244 times
Triangulation started also in the kitchen
Triangulation started also in the kitchen
House Extension 2012 002 (Small).JPG (141.65 KiB) Viewed 3244 times
House Extension 2012 001 (Small) (2).JPG
House Extension 2012 001 (Small) (2).JPG (166.07 KiB) Viewed 3244 times
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

Morning All

A week of mainly joinery and further plaster boarding, just half a day away from all plasterboarding downstairs being completed :lol:
All door casings now in place, but the downstairs kitchen was an absolute nightmare as it was going back into the original doorway from when the house was built, it was all out of line with anything the joiner tried to line up with and well after a day at it the joiner made an absolute fantastic job of it :salute:
Also got the fire door in between the garage and the kitchen, bloody heavy lifting that about :help:
I also got the cavity insulations in place at rear bi folding doors and the side of the kitchen/garage fire door.

Next week we move on to the plastering of the kitchen and maybe the downstairs w/c (the old kitchen entrance where the boiler used to hung on the wall) expecting this to take around 4 days, on a tight schedule now as the kitchen is due to be started to be fitted the Tuesday the week after :scratch: Nothing can run over or the wife will kill me :cb

Thanks for following and more up dates next week..

Cheers
Attachments
The finished triangulation for the single storey kitchen roof.
The finished triangulation for the single storey kitchen roof.
House Extension 2012 009 (Small).JPG (120.44 KiB) Viewed 3153 times
Door casings for new kitchen door entry
Door casings for new kitchen door entry
House Extension 2012 010 (Small).JPG (119.79 KiB) Viewed 3153 times
Fire door and frame now in place
Fire door and frame now in place
House Extension 2012 006 (Small).JPG (116.62 KiB) Viewed 3153 times
Cavity closures in place
Cavity closures in place
House Extension 2012 005 (Small).JPG (114.76 KiB) Viewed 3153 times
New kitchen door in place with casings on, to the left of that a little bit of plasterboarding to finish, behing there will be the downstairs W\C.
New kitchen door in place with casings on, to the left of that a little bit of plasterboarding to finish, behing there will be the downstairs W\C.
House Extension 2012 008 (Small).JPG (126.99 KiB) Viewed 3153 times
Steel supports nearly fully boarded, require a couple of layers for fire safety
Steel supports nearly fully boarded, require a couple of layers for fire safety
House Extension 2012 007 (Small).JPG (109.77 KiB) Viewed 3153 times
dewaltdisney
Senior Member
Posts: 16996
Joined: Fri Jan 20, 2006 5:51 pm
Location: Essex
Has thanked: 814 times
Been thanked: 3508 times

Re: Double side extension 2012:- 53sq metres of floor

Post by dewaltdisney »

It is coming along nicely, you are well on the way now. Just boarding out makes a major leap forward and once you start installing kitchen units you hit a significant point. Just remember that it is all the finishing that takes time and you are so dog tired of it all it is easy to slide and ruin the ship for a ha'penny of tar.

Well done so far mate :thumbright:

DWD
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

Evening all

Sorry for the delay in updating but been a little busy, all kitchen now fully plastered, electrics all in place ready, kitchen ready to be fitted Thursday, new bar stools and accessories purchased, laminate floor and under lay purchased, stud wall joinery work done in upstairs bedrooms to make it easier to board out, frame in downstairs wc in progress in order to box in electric cables and meter, rear outside double hopper fitted to take all rain water,shower,bath and sink waste plus washer,sink and dishwasher waste from kitchen area.

The appliance Sockets now have nice plastic fittings attached ready for the appliances to be plugged in soon :lol: a kitchen back, I cannot wait, eating for the last 4 weeks is taking its toll all ways round :sad:

Going forward kitchen starts to be fitted Thursday, porch and garage roof now started to the front, laminate to go down middle of next week, painter arriving shortly after....

Things really motoring, I may just may scrape it being done by Christmas, but still things to do :?

Pictures will be updated Friday as this is the first chance I will have.

Sorry for the delay...

Cheers
prem
Senior Member
Posts: 505
Joined: Mon Dec 21, 2009 9:34 pm
Location: up north
Has thanked: 0
Been thanked: 17 times

Re: Double side extension 2012:- 53sq metres of floor

Post by prem »

where did you get the kitchen from?

slacking on the pictures this week :lol:
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

Hi Prem

The kitchen has come from Sheffield kitchen Outlet, my mum and sister had there kitchen from here and they are sound people, even my joiner told me he buys everything through them as they are great quality which was nice to hear :wink:

Pictures below, sorry for the delay :LoL:

I will get myself sorted with the pics, slacking a little...

Cheers for watching....
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

Right guys and girls, pics earlier than expected, took an early day today as these long days are catching up with me :cb

More to follow in next few days, Porch blockwork tidied up today ready for the roof work to begin.....

Bed time now :cheers:
Attachments
More joinery in the WC
More joinery in the WC
House Extension 2012 008 (Small).JPG (113.38 KiB) Viewed 2960 times
Joinery in what will be the downstairs WC, put in place to ensure all the wiring and elecy meeting will be covered up
Joinery in what will be the downstairs WC, put in place to ensure all the wiring and elecy meeting will be covered up
House Extension 2012 007 (Small).JPG (118.95 KiB) Viewed 2960 times
Kitchen all ready to be fitted, little room to move to be honest thou, fitting starts tomorrow 8am Promt:)
Kitchen all ready to be fitted, little room to move to be honest thou, fitting starts tomorrow 8am Promt:)
House Extension 2012 005 (Small).JPG (132.24 KiB) Viewed 2960 times
Stripped back to ensure all the kitchen looks perfect, this was the only original wall left from the original kitchen, so it looked a little rough to be honest...
Stripped back to ensure all the kitchen looks perfect, this was the only original wall left from the original kitchen, so it looked a little rough to be honest...
House Extension 2012 004 (Small).JPG (144.05 KiB) Viewed 2960 times
A little more plastering
A little more plastering
House Extension 2012 003 (Small).JPG (136.74 KiB) Viewed 2960 times
Other wall of kitchen plastered and well on the way to drying
Other wall of kitchen plastered and well on the way to drying
House Extension 2012 002 (Small).JPG (131.06 KiB) Viewed 2960 times
Plaster boarding around the triangulation
Plaster boarding around the triangulation
House Extension 2012 001 (Small).JPG (116.32 KiB) Viewed 2960 times
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

Afternon All


Well here we go the kitchen fit is under way :cheers:

Porch has also now been started :cheers:
Attachments
Still this lot to fit thou.........
Still this lot to fit thou.........
House Extension 2012 002 (Small).JPG (131.95 KiB) Viewed 2924 times
Kitchen partly in place....
Kitchen partly in place....
House Extension 2012 001 (Small).JPG (124 KiB) Viewed 2924 times
Walchy01
Senior Member
Posts: 267
Joined: Sun Dec 11, 2011 2:36 pm
Has thanked: 41 times
Been thanked: 5 times

Re: Double side extension 2012:- 53sq metres of floor

Post by Walchy01 »

A little more progress with the Island now in place, time to order the granite :cb £££££

Also a little pic of the rear double hopper now in place.

Cheers :thumbright:
Attachments
House Extension 2012 003 (Small).JPG
House Extension 2012 003 (Small).JPG (160.23 KiB) Viewed 2909 times
House Extension 2012 002 (Small).JPG
House Extension 2012 002 (Small).JPG (121.17 KiB) Viewed 2909 times
House Extension 2012 001 (Small).JPG
House Extension 2012 001 (Small).JPG (123 KiB) Viewed 2909 times