I have ripped out ensuite and am doing a DIY refit.
The old ceiling was partly tiled, and also partly sloping, so I took off the tiles - and the plasterboard behind them.
I have replaced the plasterboard with Hardie backer board.
Should I now to skim this and paint it ?
Or should I just tile straight onto the backer board ?
I'm inclined to do the first, I don't think tiling is necessary.
What do you think / what would you do ?
Oh, and there are small gaps in the joints. These would be filled either with skim plaster or with tile adhesive - is that OK ?
Hardie backer board
Moderator: Moderators
- wine~o
- Senior Member
- Posts: 26279
- Joined: Sat Jan 10, 2009 3:49 pm
- Location: hants/dorset border
- Has thanked: 1414 times
- Been thanked: 4019 times
Re: Hardie backer board
pics would be a bonus, I'd be inclined to say don't tile unless it's going to get wet (Showerhead spray or similar)
Verwood Handyman
_____________________________________________________________________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk
_____________________________________________________________________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk
-
- Newly registered Member
- Posts: 42
- Joined: Sat Mar 20, 2010 8:19 pm
- Location: Dorset
- Has thanked: 27 times
- Been thanked: 0
Re: Hardie backer board
The sloping ceiling starts six foot (1830) above the floor, i.e. about 69" (1755) above the shower tray floor. This would (usually) be below the shower head, but not entirely immune to re-bound. But at a 45 degree slope, water would drain/drip off relatively quickly. Probably.
- wine~o
- Senior Member
- Posts: 26279
- Joined: Sat Jan 10, 2009 3:49 pm
- Location: hants/dorset border
- Has thanked: 1414 times
- Been thanked: 4019 times
Re: Hardie backer board
Assuming the slope isn't going to be getting a significant amount of water. then leave it un-tiled, just make sure that where the tiles meet the slope there is a bead of silicone to prevent water ingress....
Verwood Handyman
_____________________________________________________________________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk
_____________________________________________________________________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk
-
- Newly registered Member
- Posts: 42
- Joined: Sat Mar 20, 2010 8:19 pm
- Location: Dorset
- Has thanked: 27 times
- Been thanked: 0
Re: Hardie backer board
... and here are the pix...
- Attachments
-
- The ceiling joist running parallel to the right hand wall is higher than the others, so the plasterboard has been bent to fit.
- T_IMG_7350.JPG (178.73 KiB) Viewed 1764 times
-
- The cut line at the top of the vertical part of the wall is 1830 above the floorboards.
- T_IMG_7345.JPG (193.23 KiB) Viewed 1764 times
-
- First piece of Hardie backer board installed.
- T_IMG_7344.JPG (202.52 KiB) Viewed 1764 times
-
- Tiles and plasterboard removed from ceiling over shower.
- T_IMG_6094.JPG (204.95 KiB) Viewed 1764 times
-
- Old shower removed.
- T_IMG_6079.JPG (216.65 KiB) Viewed 1764 times
-
- Before demolition, but new loo installed.
- T_IMG_3757.JPG (29.58 KiB) Viewed 1764 times
-
- Before demolition, but with the old loo removed.
- T_IMG_2248.JPG (32.97 KiB) Viewed 1764 times