Hi Guys
A double glazing company has measured and manufactured bay (one large and two smaller windows) double glazing windows. The result is that the bay window is the wrong size. What the installer has done in his second attempt is add strips to the frame to reduce the gap (about 12cm), then remove the sills, move the frame in slightly, this has reduced the gap, but this has left other issues. The finish between the frame and beading has gaps, the joining pole is set back leaving a cavity. Too much of the frame has been covered up by a finishing strip (the company has said this is within their installation standards). They haven't been able to replace the existing sills, they took most of them away.
We took pictures as the installation was in progress.
Thanks in advance for your advice.
A double glazing company has measured and manufactured bay (one large and two smaller windows) double glazing windows. The result is that the bay window is the wrong size. What the installer has done in his second attempt is add strips to the frame to reduce the gap (about 12cm), then remove the sills, move the frame in slightly, this has reduced the gap, but this has left other issues. The finish between the frame and beading has gaps, the joining pole is set back leaving a cavity. Too much of the frame has been covered up by a finishing strip (the company has said this is within their installation standards). They haven't been able to replace the existing sills, they took most of them away.
We took pictures as the installation was in progress.
Thanks in advance for your advice.
- Attachments
-
- Window 1.JPG (20.44 KiB) Viewed 10845 times
- BillyGoat
- Troll Headbutter
- Posts: 8071
- Joined: Sat Jan 01, 2011 8:20 pm
- Location: On top of a mountain, in the long grass.
- Has thanked: 386 times
- Been thanked: 796 times
Re: Replacement Bay Windows
Which company?
That's shocking....have you paid them?
BG
That's shocking....have you paid them?
BG
Arguing with a woman is like reading a Software Licence Agreement.
In the end, you ignore everything and click "I agree".
In the end, you ignore everything and click "I agree".
-
- Senior Member
- Posts: 124
- Joined: Tue May 17, 2016 4:50 pm
- Has thanked: 119 times
- Been thanked: 0
Re: Replacement Bay Windows
Thanks for responding Billy, it's one of the big four, they are members of a federation. I'm just cautious in naming them as this is a live issue. The double glazing was sold to my elderly parents, there's a story to that too.They have been fully paid for.
They are going on about 'to their standards' etc. Adding upvc strips to the frame, doesn't sound right, can they do that?
They are going on about 'to their standards' etc. Adding upvc strips to the frame, doesn't sound right, can they do that?
BillyGoat wrote:Which company?
That's shocking....have you paid them?
BG
- BillyGoat
- Troll Headbutter
- Posts: 8071
- Joined: Sat Jan 01, 2011 8:20 pm
- Location: On top of a mountain, in the long grass.
- Has thanked: 386 times
- Been thanked: 796 times
Re: Replacement Bay Windows
Makes sense to keep it under your hat - although, it's certainly a bargaining chip later in the game.teams wrote:Thanks for responding Billy, it's one of the big four, they are members of a federation. I'm just cautious in naming them as this is a live issue. The double glazing was sold to my elderly parents, there's a story to that too.They have been fully paid for.
They are going on about 'to their standards' etc. Adding upvc strips to the frame, doesn't sound right, can they do that?
BillyGoat wrote:Which company?
That's shocking....have you paid them?
BG
Is there a contract or agreement? I'd certainly reject them, they have clearly been made incorrectly.
Have the other two been installed that way too? If not, then that goes to argue your case (not that you should need too) that they have been made differently/incorrectly!
Sure a bead or trim to finish it off, but a hole that big??? What did they even put inside it for heatloss, etc - shocking.
BG
Arguing with a woman is like reading a Software Licence Agreement.
In the end, you ignore everything and click "I agree".
In the end, you ignore everything and click "I agree".
-
- Senior Member
- Posts: 4764
- Joined: Sun Jan 31, 2010 9:21 pm
- Location: Kent, Land of Apples and PYO
- Has thanked: 100 times
- Been thanked: 876 times
Re: Replacement Bay Windows
time to get it inspected, send pics to fensa too, and get trading standards involved
that look like a typical sub-contracter bodge
that look like a typical sub-contracter bodge
- wine~o
- Senior Member
- Posts: 26279
- Joined: Sat Jan 10, 2009 3:49 pm
- Location: hants/dorset border
- Has thanked: 1414 times
- Been thanked: 4019 times
Re: Replacement Bay Windows
FENSA won't give a toss..... Trading standards are far too busy and underfunded.. what other schemes are these *fitters* a member of ??flash22 wrote:time to get it inspected, send pics to fensa
that look like a typical sub-contracter bodge
Verwood Handyman
_____________________________________________________________________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk
_____________________________________________________________________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: Replacement Bay Windows
Name and shame and share it on Facebook or whatever other social media you have access too.
That's cowboy stuff and I'm sure if you plaster that image over Facebook you'll very quickly get recompense.
That's cowboy stuff and I'm sure if you plaster that image over Facebook you'll very quickly get recompense.
- These users thanked the author steviejoiner74 for the post:
- teams
- Rating: 7.14%
Carpentry,I can explain it to you but I cannot understand it for you.
-
- Senior Member
- Posts: 365
- Joined: Tue Aug 18, 2015 8:19 pm
- Has thanked: 69 times
- Been thanked: 82 times
Re: Replacement Bay Windows
If they are registered with FENSA then please call fensa. You should no way paid in full they can have a deposit but you hold the rest till happy, usually by a set time after completion. It looks like new windows the correct size is needed.
Nothing wrong with added small extra pieces called knock ons to the frame , this is usually done so the frame isn't lost behind plaster.
Nothing wrong with added small extra pieces called knock ons to the frame , this is usually done so the frame isn't lost behind plaster.
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: Replacement Bay Windows
add-ons are fine and if it's one of the big firms like you've mentioned they'll not have taken all the money yet.
The joiner that was their to install the Windows shouldn't even have started the bay. I've fitted many hundreds of Windows and the first thing you do is check the thing will fit before you tear the old one out!! If it's the wrong size you leave alone. I've had to leave 4 or 5 this year alone as they've been measured/manufactured wrong.
Name and shame!!
The joiner that was their to install the Windows shouldn't even have started the bay. I've fitted many hundreds of Windows and the first thing you do is check the thing will fit before you tear the old one out!! If it's the wrong size you leave alone. I've had to leave 4 or 5 this year alone as they've been measured/manufactured wrong.
Name and shame!!
Carpentry,I can explain it to you but I cannot understand it for you.
-
- Senior Member
- Posts: 365
- Joined: Tue Aug 18, 2015 8:19 pm
- Has thanked: 69 times
- Been thanked: 82 times
Re: Replacement Bay Windows
Yes I always check the paper work matches the style and the size matches , measure frame and opening and double check, also show the customer the style to make sure what I'm fitting is what there expecting.
Bay windows always take along time and does often require pieces where frame meets brick, with the old timber this can be cut and shaped more easily, with upvc the sections can't be cut like that so fill pieces timber ect then trim is used but you aim to get the bay segments as tight as possible .
If the sill didn't fit I wouldn't fit the frames without and try and fit at a later date makes for a shoddy job
Bay windows always take along time and does often require pieces where frame meets brick, with the old timber this can be cut and shaped more easily, with upvc the sections can't be cut like that so fill pieces timber ect then trim is used but you aim to get the bay segments as tight as possible .
If the sill didn't fit I wouldn't fit the frames without and try and fit at a later date makes for a shoddy job
- These users thanked the author Thewindowguy for the post:
- teams
- Rating: 7.14%
-
- Senior Member
- Posts: 124
- Joined: Tue May 17, 2016 4:50 pm
- Has thanked: 119 times
- Been thanked: 0
Re: Replacement Bay Windows
Hi BillyGoat,
Billy there is a contract and we've sent them a Consumer Rights Act letter. They've sent back a 5 sentence letter, saying it's within there standards. It's a Bay Window, from left to right, one large window, then you have two small windows, side by side, thats the bay. This is for one bedroom window.
I'll post the other pics later today.
Billy there is a contract and we've sent them a Consumer Rights Act letter. They've sent back a 5 sentence letter, saying it's within there standards. It's a Bay Window, from left to right, one large window, then you have two small windows, side by side, thats the bay. This is for one bedroom window.
I'll post the other pics later today.
BillyGoat wrote:Makes sense to keep it under your hat - although, it's certainly a bargaining chip later in the game.teams wrote:Thanks for responding Billy, it's one of the big four, they are members of a federation. I'm just cautious in naming them as this is a live issue. The double glazing was sold to my elderly parents, there's a story to that too.They have been fully paid for.
They are going on about 'to their standards' etc. Adding upvc strips to the frame, doesn't sound right, can they do that?
BillyGoat wrote:Which company?
That's shocking....have you paid them?
BG
Is there a contract or agreement? I'd certainly reject them, they have clearly been made incorrectly.
Have the other two been installed that way too? If not, then that goes to argue your case (not that you should need too) that they have been made differently/incorrectly!
Sure a bead or trim to finish it off, but a hole that big??? What did they even put inside it for heatloss, etc - shocking.
BG
-
- Senior Member
- Posts: 124
- Joined: Tue May 17, 2016 4:50 pm
- Has thanked: 119 times
- Been thanked: 0
Re: Replacement Bay Windows
The company are members of the GGF. Fensa, GGF all operate from the same office.
wine~o wrote:FENSA won't give a toss..... Trading standards are far too busy and underfunded.. what other schemes are these *fitters* a member of ??flash22 wrote:time to get it inspected, send pics to fensa
that look like a typical sub-contracter bodge
-
- Senior Member
- Posts: 124
- Joined: Tue May 17, 2016 4:50 pm
- Has thanked: 119 times
- Been thanked: 0
Re: Replacement Bay Windows
At the first attempt to install, the installer was going to install them without the 'Knock-on's as can be seen in the first post,
we pointed out that the new measured/manufacturred bay window is too small. He went out to contact his field manager, came back and said he can't get hold of him. Then he made a second attempt by adding 'Knock-on's' and removing the sills then moving the two small windows in. That's why they couldn't replace the old sills, it also give the poor finish, the cavities.
we pointed out that the new measured/manufacturred bay window is too small. He went out to contact his field manager, came back and said he can't get hold of him. Then he made a second attempt by adding 'Knock-on's' and removing the sills then moving the two small windows in. That's why they couldn't replace the old sills, it also give the poor finish, the cavities.
Thewindowguy wrote:If they are registered with FENSA then please call fensa. You should no way paid in full they can have a deposit but you hold the rest till happy, usually by a set time after completion. It looks like new windows the correct size is needed.
Nothing wrong with added small extra pieces called knock ons to the frame , this is usually done so the frame isn't lost behind plaster.
-
- Senior Member
- Posts: 365
- Joined: Tue Aug 18, 2015 8:19 pm
- Has thanked: 69 times
- Been thanked: 82 times
Re: Replacement Bay Windows
so we are talking about a 3 part bay?
Are the company saying there happy with the install?
If so say you're not and would like to see the installation manager.
Really by the sounds of it they need to start again
Are the company saying there happy with the install?
If so say you're not and would like to see the installation manager.
Really by the sounds of it they need to start again
- These users thanked the author Thewindowguy for the post:
- teams
- Rating: 7.14%
-
- Senior Member
- Posts: 124
- Joined: Tue May 17, 2016 4:50 pm
- Has thanked: 119 times
- Been thanked: 0
Re: Replacement Bay Windows
Window 1 - First attempt to install, with sills in place - with huge gap.
Window 2 - Second attempt to install, with sills removed - small windows moved in, gap reduced. original sills no longer fit, they took two of them away.
window 3 - Cavities between window and beading.
Window 4 - Trim covering too much of the frame.
Window 5 - shows the old bay window.
Window 2 - Second attempt to install, with sills removed - small windows moved in, gap reduced. original sills no longer fit, they took two of them away.
window 3 - Cavities between window and beading.
Window 4 - Trim covering too much of the frame.
Window 5 - shows the old bay window.
- Attachments
-
- Window 5.JPG (20.77 KiB) Viewed 10677 times