Utility room revamp
Moderator: Moderators
-
- Senior Member
- Posts: 912
- Joined: Mon Oct 27, 2008 11:23 am
- Location: Dronfield
- Has thanked: 250 times
- Been thanked: 212 times
Utility room revamp
Was asked to rejuvenate this utility room for a good customer of mine. They had recently moved in and this was part of a 50k extension done by previous owners. It looks like they ran out of funds when it came to finishing the utility room. The tiles were badly fitted and stuck on with polyfilla!
1st pic is with old industrial sink removed, it was horrendous.
New IKEA method units fitted
Tiling and sink completed. I'm pretty pleased with the outcome and it only took 3.5 days start to finish. Not bad for a handyman. Customer was thrilled.
1st pic is with old industrial sink removed, it was horrendous.
New IKEA method units fitted
Tiling and sink completed. I'm pretty pleased with the outcome and it only took 3.5 days start to finish. Not bad for a handyman. Customer was thrilled.
-
- Senior Member
- Posts: 912
- Joined: Mon Oct 27, 2008 11:23 am
- Location: Dronfield
- Has thanked: 250 times
- Been thanked: 212 times
Re: Utility room revamp
I know. I think the owner did the tiling as the rest of the extension was of a high standard. It only took 10 minutes to pull those tiles off, no tools needed at all!M1ke_a wrote:Looks a million times better
Amongst many other issues in the original build, why tile around a power socket?
-
- Senior Member
- Posts: 129
- Joined: Tue Jan 05, 2016 8:30 am
- Location: London
- Has thanked: 58 times
- Been thanked: 18 times
Re: Utility room revamp
3.5 days, great job!
- These users thanked the author DmitriKara for the post:
- Ktuludays
- Rating: 7.14%
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: Utility room revamp
Tidy job mate! The only small thing I'd pick up on is the joining bar on the worktop,they look naff!
Carpentry,I can explain it to you but I cannot understand it for you.
-
- Senior Member
- Posts: 912
- Joined: Mon Oct 27, 2008 11:23 am
- Location: Dronfield
- Has thanked: 250 times
- Been thanked: 212 times
Re: Utility room revamp
I agree. It's what customer wanted as it was 2.7m long but they bought 2 x 2.4m worktops!!steviejoiner74 wrote:Tidy job mate! The only small thing I'd pick up on is the joining bar on the worktop,they look naff!
-
- Newly registered Member
- Posts: 70
- Joined: Sun Nov 13, 2016 7:34 pm
- Location: London
- Has thanked: 13 times
- Been thanked: 11 times
Re: Utility room revamp
couldnt agree more. lovely jobM1ke_a wrote:Looks a million times better
Amongst many other issues in the original build, why tile around a power socket?
- These users thanked the author City Flooring for the post:
- Ktuludays
- Rating: 7.14%
- smujytradeservices
- Newly registered Member
- Posts: 29
- Joined: Thu Nov 17, 2016 10:05 am
- Location: Edinburgh
- Has thanked: 10 times
- Been thanked: 4 times
Re: Utility room revamp
Looks really great. The before, during and after photos show perfectly what you accomplished. I agree the joining bar isn't ideal yet if they are happy it's fine. Good job.
-
- Senior Member
- Posts: 912
- Joined: Mon Oct 27, 2008 11:23 am
- Location: Dronfield
- Has thanked: 250 times
- Been thanked: 212 times
Re: Utility room revamp
Thanks. Probably my favourite job of the year.smujytradeservices wrote:Looks really great. The before, during and after photos show perfectly what you accomplished. I agree the joining bar isn't ideal yet if they are happy it's fine. Good job.
Sent from my HUAWEI VNS-L31 using Tapatalk
If the lessons of history teach us anything it is that nobody learns the lessons that history teaches us.