Guess I'm a trademens eh?? For the sake of 2/3 extra timbers I'm happy and the client.
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: More studwork etc
A tradesman..... That would use an extra 30% timber on a stud wall for no apparent reason other than cost the customer more money The rest of the timber frame world is doing it wrong then Tom! Stick them in at 300 centres the next time,give the customer an even better job
Seriously why would you frame a stud wall that did not structurally need it at 400 centres and not 600 centres?
Seriously why would you frame a stud wall that did not structurally need it at 400 centres and not 600 centres?
Carpentry,I can explain it to you but I cannot understand it for you.
-
- Newly registered Member
- Posts: 13
- Joined: Sun Nov 10, 2013 9:13 am
- Has thanked: 5 times
- Been thanked: 0
Re: More studwork etc
That's were we usually tell the customer we're doing it this way because it is better..! They usually turn around and say I want it doing properly so we do!! The framing done nowadays is shoddy worked on it for years on persimmon sites..... Think we're on a different wave length.
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: More studwork etc
Why is putting more needless studs in better??
Carpentry,I can explain it to you but I cannot understand it for you.
-
- Senior Member
- Posts: 6620
- Joined: Sun Jan 24, 2010 1:48 pm
- Location: Essex
- Has thanked: 39 times
- Been thanked: 621 times
Re: More studwork etc
Plus 1 for 400mm centres on timber stud work. That is how I was taught and City&Guilds taught it. I use metal stud and track for walls now lol
Mind you, City&Guilds made us let the studs into the plates.
If you go back even further in time, you never used to fix top and bottom plates it would be one or the other which was fixed.
Mind you, City&Guilds made us let the studs into the plates.
If you go back even further in time, you never used to fix top and bottom plates it would be one or the other which was fixed.
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: More studwork etc
What benefit has 400 centres on a non load bearing wall?? Someone tell me!!
Carpentry,I can explain it to you but I cannot understand it for you.
-
- Senior Member
- Posts: 418
- Joined: Thu Feb 07, 2013 8:01 pm
- Location: Fife
- Has thanked: 28 times
- Been thanked: 69 times
Re: More studwork etc
None. Most of the 6x2 kits we do are specced at 600 centres. 4x2 cls kits at 400 centressteviejoiner74 wrote:What benefit has 400 centres on a non load bearing wall?? Someone tell me!!
- These users thanked the author 182michael for the post:
- steviejoiner74
- Rating: 7.14%
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: More studwork etc
Correct Michael,unless spec by engineer or architect or load bearing 400 centres is a waste of time and money. or maybe every timber frame company and the engineers and architects that design these building are doing it wrong.....182michael wrote:None. Most of the 6x2 kits we do are specced at 600 centres. 4x2 cls kits at 400 centressteviejoiner74 wrote:What benefit has 400 centres on a non load bearing wall?? Someone tell me!!
Carpentry,I can explain it to you but I cannot understand it for you.
-
- Newly registered Member
- Posts: 13
- Joined: Sun Nov 10, 2013 9:13 am
- Has thanked: 5 times
- Been thanked: 0
Re: More studwork etc
I just do things correctly!! Extra 2-3 studs it's hurting anybody looks a strong decent jobs most other trades come on site and say "hey these lads arnt bad"
- ayjay
- Senior Member
- Posts: 9891
- Joined: Wed Nov 17, 2010 5:51 pm
- Has thanked: 458 times
- Been thanked: 1708 times
Re: More studwork etc
Regardless of whether it's load-bearing or not, I've very rarely been asked to do studwork at 600 centres, (just the occasional cheapskate), anything done to drawings has always been @ 400 centres - (usually I don't have much time for architects but I think they get this right).
When I have to do a trussed roof at 600 centres I have to put extra noggins in to support the p/b ceiling - OK so it's horizontal rather than a vertical stud, but a ceiling @ 400 centres doesn't need the extra noggins.
When I have to do a trussed roof at 600 centres I have to put extra noggins in to support the p/b ceiling - OK so it's horizontal rather than a vertical stud, but a ceiling @ 400 centres doesn't need the extra noggins.
One day it will all be firewood.
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: More studwork etc
You have still not given 1 reason why 400 centres is needed? "Looks a strong decent job" or "hey these lads aren't bad" is not a reason.Tomwardframer wrote:I just do things correctly!! Extra 2-3 studs it's hurting anybody looks a strong decent jobs most other trades come on site and say "hey these lads arnt bad"
Carpentry,I can explain it to you but I cannot understand it for you.
- wine~o
- Senior Member
- Posts: 26273
- Joined: Sat Jan 10, 2009 3:49 pm
- Location: hants/dorset border
- Has thanked: 1414 times
- Been thanked: 4017 times
Re: More studwork etc
I always do mine @ 450mm...
You do realise I'm joking here...right??
You do realise I'm joking here...right??
Verwood Handyman
_____________________________________________________________________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk
_____________________________________________________________________________
If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :
http://www.donnasdreamhouse.co.uk
-
- Senior Member
- Posts: 6620
- Joined: Sun Jan 24, 2010 1:48 pm
- Location: Essex
- Has thanked: 39 times
- Been thanked: 621 times
Re: More studwork etc
Good job I didn't slag the job off for only having one row of noggins instead of two ha ha ha
That would have created more tomfoolery.
I haven't a clue when the 600C's came in. never done it, never saw it on site, wasn't taught that way at work or college. never seen it in any of my many books. My many books do point out the incorrect way or lazy way so when I get access to them I shall have a gander amongst them to see if they mention anything.
My gut feeling is that new build being new build, they follow there own cost cutting agenda. The major players save X amount on a development by using less timber, that equates to more profit. It certainly doesn't make the house £300 cheaper for the new owner to buy!
They also plough money back into the system (with the obvious tax breaks) and you can bet that any change was brought about by corruption. They are more corrupt than an undercover corruption officer at a corruption convention up North.
That would have created more tomfoolery.
I haven't a clue when the 600C's came in. never done it, never saw it on site, wasn't taught that way at work or college. never seen it in any of my many books. My many books do point out the incorrect way or lazy way so when I get access to them I shall have a gander amongst them to see if they mention anything.
My gut feeling is that new build being new build, they follow there own cost cutting agenda. The major players save X amount on a development by using less timber, that equates to more profit. It certainly doesn't make the house £300 cheaper for the new owner to buy!
They also plough money back into the system (with the obvious tax breaks) and you can bet that any change was brought about by corruption. They are more corrupt than an undercover corruption officer at a corruption convention up North.
- steviejoiner74
- Senior Member
- Posts: 8005
- Joined: Sun Aug 18, 2013 7:04 pm
- Location: Fife
- Has thanked: 747 times
- Been thanked: 1616 times
Re: More studwork etc
I think a lot of you guys doon sooth do 400 centres to accommodate running wall sheets horizontal which I find strange as well. Anybody got a proper reason for 400 centres over 600 yet