Hello chaps
I am struggling a bit here. As you can see (sort of) that I have built a partition wall and installed a thermostatic built in shower control.
I have used aquapanel in the shower area (picture 2) and moisture resistant plasterboard elsewhere but you can see from the pictures that I need to '"fill the gap" (picture 1) just behind the partition wall and build the wall out to be level with the vertical wood piece in picture 2
Another sheet of plaster board over the existing one will make it level with the partition wall (picture 2)
However I am not sure how to stop any movement at the edge where the new plaster board will join up with the timber.
i was thing of using those flat metal beadings, attaching it to teh wood and plaster board using a staple gun
any ideas?
Many Thanks to all
How do I prepare this wall for tiling
Moderator: Moderators
-
- Mr. Grumpy
- Posts: 3193
- Joined: Tue Nov 18, 2008 3:41 pm
- Has thanked: 25 times
- Been thanked: 109 times
How do I prepare this wall for tiling
- Attachments
-
- Picture 3
- IMG_0674 (Small).jpg (27.75 KiB) Viewed 1073 times
-
- Picture 2
- IMG_0673 (Small).jpg (19.9 KiB) Viewed 1073 times
-
- Picture 1
- IMG_0676 (Small).jpg (18.97 KiB) Viewed 1073 times