Shower renovation - next steps
Posted: Sun Jan 15, 2012 11:37 am
Hi,
Following the helpful suggestions to my post (shower-renovation-t52061.html) I have stripped my wall back to the 2 studded walls and 1 bare concrete wall.
Once I had removed the shower tray and supporting beams I will prepare the shower area. I intend to do as follows:
· Stud walls – install aquapanel.
· Concrete wall – use BAL quickset render to true up the wall where I was a little overenthusiastic with the chipping hammer and remove the remaining areas of adhesive.
· Tank the whole area with BAL WP1, tape, matting etc
· Tile
I have read so many conflicting posts on use / don’t use aquapanel, do/don’t tank etc which sometime seems a little academic. Please can someone sense check this approach for me before I begin. I would rather pay a bit more and do a bit more to make sure this is done properly as this is my first project of this size!
Thanks in advance.
Following the helpful suggestions to my post (shower-renovation-t52061.html) I have stripped my wall back to the 2 studded walls and 1 bare concrete wall.
Once I had removed the shower tray and supporting beams I will prepare the shower area. I intend to do as follows:
· Stud walls – install aquapanel.
· Concrete wall – use BAL quickset render to true up the wall where I was a little overenthusiastic with the chipping hammer and remove the remaining areas of adhesive.
· Tank the whole area with BAL WP1, tape, matting etc
· Tile
I have read so many conflicting posts on use / don’t use aquapanel, do/don’t tank etc which sometime seems a little academic. Please can someone sense check this approach for me before I begin. I would rather pay a bit more and do a bit more to make sure this is done properly as this is my first project of this size!
Thanks in advance.