ADVICE PLEASE: floor levelling with large drop & heating mat
Posted: Sun Dec 06, 2015 10:05 am
I have a kitchen/diner approx. 5m x 4m with a concrete floor. I want to tile whole floor area over an under floor heating matt.
Only issue is the existing concrete floor has a slope and when you put long level it has a 5.5 cm drop on it from one end to the other. Would you recommend laying heating matt 1st and then pouring floor level compound over it, then tiling once set? Or would you do another way?
Any advice appreciated.