I am after some suggestion/advice on preparing wall and wooden floor before tiling.
my initial plan was to just replace floor tiles as most of these were cracked over time and there is always small water leak whenever someone takes shower (now i know why),
It looks like I have opened the can of worm.

I am sure I have to replace plasterboard with cement board (as I read from other posts) but question is do I have to remove all plasterboard or can I getaway with just replacing half (about 5 tiles from shower tray corner on each side of shower tray?
What about floor? Do I need to put poly and tile over it or poly first then cement board on top of it and then tile?