Woo, Tiling am I slow? What sort of time would it take to...
Posted: Thu Apr 24, 2008 9:59 pm
Hi Tilers,
I've just finished my splash back around the kitchen I'm working on (rebuilding) ready to decorate tomorrow (this is the kitchen area of a kitchen dining area).
I had to tile to and round 2 pipe cases.
Let me try to explain the work. Wall to pipe case, pipe chase comes off wall at 90°, travels for about 50mm then turns parallel to wall at 90° for about 75mm, then pipe case turns at 90° off wall for about 25mm then returns to parallel at 90° for about 30mm where it meets the window!
3 tiles high (100mm x 300mm brick style tiles) I retained the brick pattern where necessary and it was topped off with glass and tile border on a tape.
There where 2 outside corners so beaded, I reckon it took me about 2 and 1/2 hours just to get round this particular corner maybe 3 hours.
Is that slow or OK could do better?
I really enjoyed the challenge and I'm definitely getting better, just not sure if I'm really slow or not.
I've just finished my splash back around the kitchen I'm working on (rebuilding) ready to decorate tomorrow (this is the kitchen area of a kitchen dining area).
I had to tile to and round 2 pipe cases.
Let me try to explain the work. Wall to pipe case, pipe chase comes off wall at 90°, travels for about 50mm then turns parallel to wall at 90° for about 75mm, then pipe case turns at 90° off wall for about 25mm then returns to parallel at 90° for about 30mm where it meets the window!
3 tiles high (100mm x 300mm brick style tiles) I retained the brick pattern where necessary and it was topped off with glass and tile border on a tape.
There where 2 outside corners so beaded, I reckon it took me about 2 and 1/2 hours just to get round this particular corner maybe 3 hours.
Is that slow or OK could do better?
I really enjoyed the challenge and I'm definitely getting better, just not sure if I'm really slow or not.