Tiling Bathroom
Moderator: Moderators
-
- Newly registered Member
- Posts: 14
- Joined: Tue Nov 25, 2008 12:38 am
- Has thanked: 0
- Been thanked: 0
Tiling Bathroom
Im planning on tiling floor to ceiling bathroom and on suite. Ive boarded both in green moisture check board and then skimmed over with multifinish, spoke to spreads and tilers and some said skim it and some said dont. Anyway ive now mist coated emulsion all over it and ceilings so have I cocked it up for the tile adhesive. Also got aqua board screwed to studwork for the shower but have now increased size of tray by 100mm so board is short by that much. Will it matter or will last row of tiles eventually fall off? Would like to do it right so any help appreciated.