Name is Danny and from Chesterfield. Bought our first and last house a few months ago in a semi rural area. It's stone built and 170+ years old.
Recently made the decision to go through the house and gut it, top to bottom. Main reason is that although the house is perfectly fit for living in, I wanted to add our own touches to it, satisfy myself that everything 'behind the walls' is fundamentally sound and also to give me something to give myself a focus of sorts away from my day job. I work in IT but as a youth, did some building work on the usual government schemes back in the 80's (not to a qualification level though).
I'm not a bad handyman around the house and I do pick things up pretty quickly. This takes it to another level of course.
I'm not pressed to a timeline, but order of things as they look at the moment are:
- Gut Master Bedroom (self, in progress).
- Remove chimney breast from same and cap off in attic (Builder).
- Gut 2nd bedroom.
- Gut dining room, including taking up concrete floor (self).
- Gut living room, including taking up floor (self).
- Open up living room outer wall to panoramic bi/tri-folds, or similar (Builder).
- Gut Kitchen, Including taking up floor (self)
- Open up dividing wall between kitchen and dining room (Builder).
- Gut staircase/Hallway.
Renovation steps:
- All internal walls re-pointed (Self).
- New Floorboarding in Bedrooms as Required (Self).
- Full Re-wire (Electrician).
- Fully Networked (Self).
- Fully Alarmed (Self).
- [provisional] Full House Speaker System Install (Self).
- Full Re-Plaster of Master Bedroom [this is to re-establish a 'comfort zone' for the missus after living in a 'cave' for so long] (Plasterer).
- Underfloor Heating Installed Through Kitchen, Living & Dining Room (Self/Plumber).
- Concrete Floors Re-Layed (Self).
- Full Re-Plaster Throughout in Provisional Order: Kitchen | Dining Room | Living Room | Staircase/Hallway | 2nd Bedroom (Plasterer).
- Re-insulate Attic
Anyway. It will be a stop/start journey based on the ebb & flow of cash availability, but we'll get there in the end.
I will get some photo's up later of the current state and keep it updated with progress shots. I will of course be reaching out to the pro's on this forum, as and when I need advice/guidance for each unique job I have to tackle and whether I should be even attempting it as an unqualified professional. look out for my first post coming soon on what I need to do re engaging local gov building regs/control.
Thanks in advance for all the support provided.
/Danny