Typical job
Posted: Mon Aug 11, 2008 9:05 pm
About right...
Leave the yard just after 5am, get to the job in middle of London about 8.30.
9am, weve got a parking ticket.
No genie lift yet.
Do what we can, then the lift turns up at 1.30pm. Tries getting the other bit of the job up, whoever measured it didnt notice that the wall runs out by 40mm over about 800mm each side
Need to bring it back to the workshop to 'adjust it'
Then got caught in traffic coming out. Got home about 8.45 tonight.
Leave the yard just after 5am, get to the job in middle of London about 8.30.
9am, weve got a parking ticket.
No genie lift yet.
Do what we can, then the lift turns up at 1.30pm. Tries getting the other bit of the job up, whoever measured it didnt notice that the wall runs out by 40mm over about 800mm each side
Need to bring it back to the workshop to 'adjust it'
Then got caught in traffic coming out. Got home about 8.45 tonight.