Tiling on a brand new floor
Posted: Thu Mar 11, 2010 6:01 pm
Ive got a tiling job to do for the inlaws. Its in a room thats had a new floor laid after the old one crumbled and lifted due to a problem with ash content in the old floor.
It was dug out to get rid of all the ash (800 mm) then hardcore, concrete and finally a screed to finish it off. The work was done by a mate of mine who's a builder and he told me to leave it 5 weeks or so before tiling.
After the 5 weeks can i just tile straight onto the new screed or is there anything i should do first, preperationwise.
Thanks in advance,
Fred.
It was dug out to get rid of all the ash (800 mm) then hardcore, concrete and finally a screed to finish it off. The work was done by a mate of mine who's a builder and he told me to leave it 5 weeks or so before tiling.
After the 5 weeks can i just tile straight onto the new screed or is there anything i should do first, preperationwise.
Thanks in advance,
Fred.