4 weeks for plaster!
Posted: Sat Mar 27, 2010 5:45 pm
I was just about to proceed with tiling when i read some info on the Bal Blue Star adhesive tub saying that plaster needs 4 weeks (4 weeks!) before tiled over. I've made patch repairs from where the previous tiles were taken off, do I really have to wait 4 weeks (4 weeks!) before I can tile over there???!
How bad can it be?! Does everyone do this?
How bad can it be?! Does everyone do this?