Floor tiling directly onto retrofit wet UFH overboard.
Eg. Cellecta HiDeck 18, Polypipe Overlay, WundaTrade EPS 400
They are designed to go onto existing concrete and can take stone tiles without any screed, or so they claim.
Anyone had experience of floor tiling directly onto these type of boards.
Particularly interested to hear if anyone has any personal experience.
Thanks
So far, these are the only 3 I have found that claim to take stone/ceramic tiles direct.
Cellecta HiDeck 18 £30.00/m2
Polypipe Overlay £22.00/n2
WundaTrade EPS 400 £17.00/m2
Do you know any others?
Floor tiling directly onto retrofit wet UFH overboard.
Moderator: Moderators
- getthewheelsinline
- Senior Member
- Posts: 754
- Joined: Sun Jan 06, 2013 5:14 pm
- Location: Scotland
- Has thanked: 224 times
- Been thanked: 182 times
Re: Floor tiling directly onto retrofit wet UFH overboard.
Bought Polypipe overlay - still to lay. This is just a cement board so I see no reason as why tiling won't work.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
- moderator2
- UHM Super Moderator
- Posts: 4566
- Joined: Fri Jan 27, 2006 10:54 pm
- Has thanked: 155 times
- Been thanked: 566 times
Re: Floor tiling directly onto retrofit wet UFH overboard.
Just one thread per topic please. I'll delete the other one.